983RV Life983RV Life
  • Build Log
  • Research
  • Additional Builders
  • Travel

Build Log

Empennage

Skin Dimpling Left Elevator

I got the skin dimpling done for the left side. I noticed that one of the holes must not have been drilled out when I was match drilling. I’ll have to reassemble that area and then drill that hole. Everything went pretty smoothly though. I didn’t have a good idea Read more

By olanandkate, 4 yearsDecember 13, 2021 ago
Empennage

Left Elevator Deburring

I got almost all of the deburring done on the left elevator. I noticed that I had forgotten to prep the edge of the lightening circles on the front spar, so I got that done. I redid some of the fold work on the elevator skins too because it wasn’t Read more

By olanandkate, 4 yearsDecember 12, 2021 ago
Empennage

Elevator Trim Access Panel Prep

After I had finished all of the match drilling yesterday, it was time to work on these access panels before it has to be entirely disassembled. I did both the left and right elevator since my missing hardware does not affect me prepping these parts. Getting the nut plate drilled Read more

By olanandkate, 4 yearsDecember 11, 2021 ago
Empennage

Full Assembly and Match-drilling

I got all of the pieces done and assembled and match drilled up to Page 9-8 Step 3. Even though these are just like the rudder in a way, they have quite a few more pieces in total since you are building two at the same time. I did run Read more

By olanandkate, 4 yearsDecember 9, 2021 ago
Empennage

Elevators – Pages 9-3 through 9-6

I got quite quite a bit of clecoing done today as well as a little bit of the match drilling. The coolest part was doing the tab bends on the E-1001A & B skins. Using the mushroom bit in the rivet gun worked like a champ on getting those bends Read more

By olanandkate, 4 yearsNovember 27, 2021 ago
Empennage

Deburring, Fluting, and Initial Assembly

I spent quite a bit of time going through and deburring all of the elevator pieces minus the large skin edges. That took the most time out of all of this. I then worked on the 903 and 904 pieces to get them straight and level. Mine came pre-fluted but Read more

By olanandkate, 4 yearsNovember 25, 2021 ago
Empennage

Starting on the Elevators

My son and I found all of the elevator parts in the attic and brought them down to start working on them. I’m not including the searching and inventory time in yesterday’s work. We got all of the protective plastic off of them and I cut the ribs per the Read more

By olanandkate, 4 yearsNovember 24, 2021 ago
Empennage

Horizontal Stabilizer Finished!

Oh man, this was a TON of riveting. My previous sections didn’t have this many rivets, but it was very rewarding! After I got caught up and then some on Friday after work, I really dug in all day Saturday and a little bit on Sunday. This was all riveting Read more

By olanandkate, 4 yearsNovember 21, 2021 ago
Empennage

More HS Skin Riveting

It has been a long while since I last worked on the plane. I’ve not had much time and I probably need to see how best to use an hour here and there to do this build. I had a good three hours today (11/19/2021) so I got after it. Read more

By olanandkate, 4 yearsNovember 20, 2021 ago
Empennage

Partial Assembly of HS Completed

I did quite a bit of work over this weekend. I finished all of the deburring on Friday night (6/11/2021) and got everything ready for priming the next morning. I primed all of the parts and then while the paint cured we went and look at travel trailers with the Read more

By olanandkate, 4 yearsJune 14, 2021 ago

Posts pagination

Previous 1 … 25 26 27 … 31 Next

Aircraft Build Time

Airplane sectionBuild time (hrs)
Avionics/Electronics9
S06 - Vertical Stabilizer22.5
S07 - Rudder34.25
S08 - Horizontal Stabilizer49.75
S09 - Elevators59
S10 - Tailcone75.75
S11 - Empennage Attach27.75
S12 - Empennage Fairings26.5
S13 - Main Spar18.25
S14 - Wing Ribs35.5
S15 - Rear Spar29.25
S16 - Top Skins32.75
S17 - Outboard Leading Edge34.75
S18 - Fuel Tank79.5
S20 - Bottom Skins42.25
S21 - Aileron35.5
S22 - Flap44
S23 - Aileron Actuation11
S24 - Wing Tip Installation14.5
S25 - Mid Fuselage Bulkheads0.25
S26 - Mid Fuselage Ribs Bottom Skins0.25
S27 - Firewall0.25
S28 - Forward Fuselage Bulkhead Ribs0.25
S29 - Fuselage Side Skins4
S30 - Step Installation2
S31 - Upper Forward Fuselage0.25
S32 - Tailcone Attach14.75
S33 - Baggage Area18.25
S35 - Access & Floors3.5
S36 - Brake Lines4.5
S38 - Rudder Pedals & Brake System12.5
Total742.5
Recent Posts
  • Rear Baggage Panels Drilled and a right Baggage Panel Installed
  • Baggage Bulkhead Partially Installed
  • Baggage Floor Completed
  • Antenna Doublers Fabricated and Ready for Riveting
  • Baggage Floor and Rear Seat Floor Drills and Dimpled (almost)
Recent Comments
    Archives
    • September 2025
    • August 2025
    • July 2025
    • June 2025
    • May 2025
    • April 2025
    • February 2025
    • January 2025
    • December 2024
    • October 2024
    • September 2024
    • August 2024
    • July 2024
    • September 2023
    • August 2023
    • July 2023
    • June 2023
    • May 2023
    • January 2023
    • December 2022
    • September 2022
    • August 2022
    • April 2022
    • March 2022
    • December 2021
    • November 2021
    • June 2021
    • May 2021
    • April 2021
    • February 2021
    • January 2021
    • December 2020
    • November 2020
    • October 2020
    • September 2020
    • July 2020
    • June 2020
    • May 2020
    Categories
    • Avionics
    • Costs
    • Empennage
    • Fuel System
    • Fuselage
    • Research
    • Tools
    • Travel
    • Uncategorized
    • Wings
    • Workshop
    Hestia | Developed by ThemeIsle