Build Log

Empennage

Elevator Push Rod Completed and Rudder Installed

I got the pushrod completed today. I just created 60 ml of primer and just swirled it around on the inside. I checked and it created a complete coverage on the inside. I let it dry for an hour or two before putting the caps on each end with the Read more

By olanandkate, 2 yearsAugust 12, 2023 ago
Empennage

Pushrod Prep

I got all of the prep work done for the push rod today. I just need to get some primer on the inside tomorrow, rivet it together and install it. I also got a good hack from the Facebook group. I was having trouble getting my spacing washers installed for Read more

By olanandkate, 2 yearsAugust 12, 2023 ago
Empennage

Vertical Stabilizer Attached & Rudder Stop SB Completed

I had bought the rudder stop service bulletin hardware a while ago, but just hadn’t executed on it yet since it was up in the attic. I knew I would pull it down at sometime so I just waited. I finally got that done which we can see the completed Read more

By olanandkate, 2 yearsAugust 11, 2023 ago
Empennage

Horizontal Stabilizer Attached

I got all of the work done to attach the horizontal stabilizer today. I saw that I did not trim down the shims on the forward portion of the horizontal stabilizer properly so I spent some time reshaping those. Luckily I had to remove more material so it wasn’t a Read more

By olanandkate, 2 yearsAugust 9, 2023 ago
Empennage

Control Horns Drilled & VS Attach Point Ready

I got the control horns drilled, the vertical stabilizer forward attachment point prepped, and I also got all of the horizontal stabilizer spacers cut and stuck on to the forward horizontal stabilizer brace attachment points. I’ll have to figure out where to put the rest of the parts before I Read more

By olanandkate, 2 yearsAugust 8, 2023 ago
Empennage

Elevator Control Horn Initial Drilling

I didn’t get too much time yesterday but I did go back and tighten up the lock nuts for the elevator threaded rod end bearings that I forgot to do the other day on the elevators. I also found a piece of wood that was exactly the width I needed Read more

By olanandkate, 2 yearsAugust 7, 2023 ago
Empennage

Elevators Aligned & Installed

Over the past few days I’ve worked here and there to get both the left and right elevators straight and the control horns drilled. I was surprised that the drill bushing was not only larger in diameter (which they warned us about) but I also had to figure a way Read more

By olanandkate, 2 yearsAugust 4, 2023 ago
Empennage

Left Elevator Initial Attachment

I didn’t get alot of time to work on the plane this weekend with all of the church and band activities we participated in. I did get the left elevator attached and measured the gap along the counter balance. It is 1/16″ wider at the front than at the back. Read more

By olanandkate, 2 yearsJuly 31, 2023 ago
Empennage

Empennage Attach Step 1

I decided to go on ahead and go through the empennage attach section since I’m still waiting on Van’s to get back with me on the elevator tab template. I also don’t want to pull all of the wing parts out just yet since I was reviewing the parts I Read more

By olanandkate, 2 yearsJuly 28, 2023 ago
Empennage

Redoing Elevator Trim Tabs – Drilling Rivets Out

Got my first hour of rework done on the trim tabs. I needed to recover some of the parts that I could salvage which was the hinge and the clevis horn components. I hit Vans up for a PDF of the foam rib templates so hopefully they answer tomorrow so Read more

By olanandkate, 2 yearsJuly 27, 2023 ago

Posts pagination

Previous 1 … 21 22 23 … 31 Next

Aircraft Build Time

Airplane sectionBuild time (hrs)
Avionics/Electronics9
S06 - Vertical Stabilizer22.5
S07 - Rudder34.25
S08 - Horizontal Stabilizer49.75
S09 - Elevators59
S10 - Tailcone75.75
S11 - Empennage Attach27.75
S12 - Empennage Fairings26.5
S13 - Main Spar18.25
S14 - Wing Ribs35.5
S15 - Rear Spar29.25
S16 - Top Skins32.75
S17 - Outboard Leading Edge34.75
S18 - Fuel Tank79.5
S20 - Bottom Skins42.25
S21 - Aileron35.5
S22 - Flap44
S23 - Aileron Actuation11
S24 - Wing Tip Installation15.5
S25 - Mid Fuselage Bulkheads0.25
S26 - Mid Fuselage Ribs Bottom Skins0.25
S27 - Firewall0.25
S28 - Forward Fuselage Bulkhead Ribs0.25
S29 - Fuselage Side Skins4
S30 - Step Installation2
S31 - Upper Forward Fuselage0.25
S32 - Tailcone Attach14.75
S33 - Baggage Area21.5
S35 - Access & Floors3.5
S36 - Brake Lines4.5
S38 - Rudder Pedals & Brake System12.5
Total746.75
Recent Posts
  • More Wingtip Wiring
  • Rear Baggage Panel Complete
  • Rear Baggage Panels Drilled and a right Baggage Panel Installed
  • Baggage Bulkhead Partially Installed
  • Baggage Floor Completed
Recent Comments
    Archives
    • September 2025
    • August 2025
    • July 2025
    • June 2025
    • May 2025
    • April 2025
    • February 2025
    • January 2025
    • December 2024
    • October 2024
    • September 2024
    • August 2024
    • July 2024
    • September 2023
    • August 2023
    • July 2023
    • June 2023
    • May 2023
    • January 2023
    • December 2022
    • September 2022
    • August 2022
    • April 2022
    • March 2022
    • December 2021
    • November 2021
    • June 2021
    • May 2021
    • April 2021
    • February 2021
    • January 2021
    • December 2020
    • November 2020
    • October 2020
    • September 2020
    • July 2020
    • June 2020
    • May 2020
    Categories
    • Avionics
    • Costs
    • Empennage
    • Fuel System
    • Fuselage
    • Research
    • Tools
    • Travel
    • Uncategorized
    • Wings
    • Workshop
    Hestia | Developed by ThemeIsle