I changed my mind a little bit on where exactly to run the static line. I was going to run it along the upper stringer until I got to the baggage bulkhead, but then it got to the point where I wasn’t sure how best to get the bolts through and keep them flush for the baggage bulkhead panels to mount flush. So I decided to run it down the bulkhead just before the baggage bulkhead and then securely mount it to the bottom of the tailbone. Waiting for those mounts to fully cure before I zip tie it down. The rest of mounted with adel clamps and then I have a snap in bushing to get through the bulkhead to the next section where I will actually connect to the static ports. It’s looking good and I hope to have this rear section done before we leave for Oshkosh.


0 Comments

Leave a Reply

Avatar placeholder

Your email address will not be published. Required fields are marked *