983RV Life983RV Life
  • Build Log
  • Research
  • Additional Builders
  • Travel

Build Log

Fuel System

Tanks Prepared for Disassembly

I got the left tank 100% complete for disassembly and dimpling. I got the right tank to the same spot also but since I am missing the J channel I’ll have to leave it where it is at until I can get that done. Luckily they shipped it today so Read more

By Olan Hodges, 6 months ago
Fuel System

Tanks Mostly Assembled and One J-Channel Drilled

I got all of the parts deburred today and I assembled the tanks. I realized last week that I only had one J-channel where I needed two for this next step. I ordered the replacement but I’m not sure how long that is going to take to arrive from Van’s. Read more

By Olan Hodges, 6 months ago
Fuel System

More Tank Part Deburring

Just more edge and hole deburring. This was a good way to destress from the past few days. The ribs in this photo still need the edge rivet holes deburred and then I need to deburr the parts on the back edge of the table still. But the parts next Read more

By Olan Hodges, 6 months ago
Fuel System

Tank Ribs Straightened and Zee Brackets and Stiffeners Separated and Deburring Started

Long title but I try to put what I did in the title. I got all of the tank ribs deburred today. It only took another hour to finish that. I then separated all of the zee brackets and tank skin stiffeners and started deburring some of them.

By Olan Hodges, 6 months ago
Fuel System

Straightening Tank Ribs Day 1

Here are all of the wings parts gathered for the next section of assembly. I had on and off again time to work on the ribs. That’s why I think this took me longer than usual as I kept getting interrupted. Either way I got 10 of the ribs done Read more

By Olan Hodges, 6 months ago
Wings

Section 17 – Outboard Leading Edges Complete

The boys were both busy today so I decided to see if my wife could help. She did an excellent job and bucked the rivets like a champ! I’ve got all of the gas tank parts down from the attic so I can start on that tomorrow.

By Olan Hodges, 6 months ago
Wings

Right Leading Edge Partially Riveted

I got the wing moved over and I modified the wing stand so that it has the carpet sling to hold the leading edge. I then got the leading edge almost completely riveted but I didn’t have anyone to buck the other portion. Hopefully I’ll get one of the boys Read more

By Olan Hodges, 6 months ago
Wings

Left Wing Leading Edge Complete

I didn’t get a lot of time tonight but I did get Andrew and finish setting the remaining rivets on the left leading edge. I plan to get a good portion of the right wing done tomorrow.

By Olan Hodges, 6 months ago
Wings

Left Leading Edge Almost Installed

I got most of the work done. Brendon seemed a bit out of it so I didn’t want to push him too much tonight to help me. Just have the top row of rivets to set and this leading edge will be fully installed.

By Olan Hodges, 6 months ago
Wings

Leading Edges Riveted

The leading edge assemblies are now done. Now I just need to attach them to the wing assemblies.

By Olan Hodges, 6 months ago

Posts pagination

Previous 1 … 16 17 18 … 36 Next

Aircraft Build Time

Airplane sectionBuild time (hrs)
Avionics/Electronics12.75
S06 - Vertical Stabilizer22.5
S07 - Rudder34.25
S08 - Horizontal Stabilizer49.75
S09 - Elevators59
S10 - Tailcone75.75
S11 - Empennage Attach27.75
S12 - Empennage Fairings26.5
S13 - Main Spar18.25
S14 - Wing Ribs35.5
S15 - Rear Spar29.25
S16 - Top Skins32.75
S17 - Outboard Leading Edge34.75
S18 - Fuel Tank79.5
S20 - Bottom Skins42.25
S21 - Aileron35.5
S22 - Flap44
S23 - Aileron Actuation11
S24 - Wing Tip Installation15.5
S25 - Mid Fuselage Bulkheads0.25
S26 - Mid Fuselage Ribs Bottom Skins0.25
S27 - Firewall0.25
S28 - Forward Fuselage Bulkhead Ribs0.25
S29 - Fuselage Side Skins4
S30 - Step Installation2
S31 - Upper Forward Fuselage0.25
S32 - Tailcone Attach14.75
S33 - Baggage Area28
S34 - Baggage Door8
S35 - Access & Floors7.75
S36 - Brake Lines4.5
S37 - Fuel System6
S38 - Rudder Pedals & Brake System13
S39 - Control System10.75
S40 - Flap System5
S41 - Upper Forward Fuselage Installation9
S42 - Rear Seat Backs7.5
S46 - Engine Mount & Gear0.75
S49 - Seats12
S50 - Cabin Heat1
Total821.75

Recent Posts

  • Andair Fuel Valve Has Arrived!
  • Right Wing Tip Wiring Complete
  • CANBUS Wiring and Power/Ground for GMU/GSA
  • Wing Tip Light Wiring – Right Side Done
  • Section 41 Complete!

Recent Comments

No comments to show.

Archives

  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • February 2025
  • January 2025
  • December 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • January 2023
  • December 2022
  • September 2022
  • August 2022
  • April 2022
  • March 2022
  • December 2021
  • November 2021
  • June 2021
  • May 2021
  • April 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • July 2020
  • June 2020
  • May 2020

Categories

  • Avionics
  • Controls
  • Costs
  • Empennage
  • Firewall
  • Fuel System
  • Fuselage
  • Landing Gear
  • Lighting
  • Research
  • Tools
  • Travel
  • Uncategorized
  • Wings
  • Workshop
Hestia | Developed by ThemeIsle