Fuselage

Baggage Conduits Complete

I got the parts I needed 3D printed from Allan Glen’s website. I printed them in polycarbonate which felt really rigid. I installed them and got the conducting run and trimmed. My antennas will be arriving tomorrow as well as Read more

By Olan Hodges, 7 months ago
Fuselage

Baggage Conduit Run & Antennas Ordered

I didn’t spend too much time today on the build. I feel like I’ve been making so much progress recently I really need to sit down and do proper planning so I don’t seal something up that I need access Read more

By Olan Hodges, 7 months ago
Fuselage

Rear Floorboards Installed

I decided I could at least get the rear floorboards installed while I’m finishing my planning for the conduit runs under the rear seats/baggage area. That was a bigger pain than I expected LOL They had solid rivets for the Read more

By Olan Hodges, 7 months ago
Fuselage

Rudder Cable Linkages Complete

Wrapping up this section for now and I will come back to it at a later date. I fabricated all four of the rudder cable linkages and got them installed. I will need to remove them later when I have Read more

By Olan Hodges, 7 months ago
Fuselage

Brake Lines Finished and Rudder Wire Guides Installed

I installed the steel braided lines which wasn’t too difficult since it is basically just screwing on both ends. The flexible lines were a bit more of a pain. The brass ferrules that needed to be installed in the ends Read more

By Olan Hodges, 7 months ago
Fuselage

Rudder Pedals Installed and Rudder Cables Ran

Ok, I ended up having more time than I expected. By the time we got to the game we were only 20ish minutes away from kickoff and parking was now way too far away so I dropped the family off Read more

By Olan Hodges, 7 months ago
Fuselage

Rudder Pedals Assembled

I didn’t get a ton of time today as I have a baptism that I get to attend and then my son is playing in the OU band tonight for their high school recruitment night so I got as much Read more

By Olan Hodges, 7 months ago
Fuselage

Rudder Pedals Cut, Deburred, and Primed

While I’m still waiting to decide on what fuel system I want to use, I went ahead and started section 37 which is the installation of the rudder pedals, brake cylinders, and rudder cabling. So the title pretty much wraps Read more

By Olan Hodges, 7 months ago
Fuselage

Front Floorboards Installed

I realized as I was going back through the sections and double checking their work that they didn’t do two things. One was install the front floor boards permanently and two was to secure the rear vents. I got both Read more

By Olan Hodges, 7 months ago
Fuselage

Brake Lines Complete (Almost)

I decided to move forward with some of the sections that I knew needed to be done and would not interfere with the other sections I was jumping past. So I decided to do the brake lines. A pretty easy Read more

By Olan Hodges, 7 months ago

Posts pagination

Previous 1 … 7 8 9 … 39 Next

Aircraft Build Time

Airplane sectionBuild time (hrs)
Avionics/Electronics18.25
S06 - Vertical Stabilizer22.5
S07 - Rudder34.25
S08 - Horizontal Stabilizer49.75
S09 - Elevators59
S10 - Tailcone75.75
S11 - Empennage Attach27.75
S12 - Empennage Fairings26.5
S13 - Main Spar18.25
S14 - Wing Ribs35.5
S15 - Rear Spar29.25
S16 - Top Skins32.75
S17 - Outboard Leading Edge34.75
S18 - Fuel Tank79.5
S20 - Bottom Skins42.25
S21 - Aileron35.5
S22 - Flap44
S23 - Aileron Actuation11
S24 - Wing Tip Installation15.5
S25 - Mid Fuselage Bulkheads0.25
S26 - Mid Fuselage Ribs Bottom Skins0.25
S27 - Firewall0.25
S28 - Forward Fuselage Bulkhead Ribs0.25
S29 - Fuselage Side Skins4
S30 - Step Installation2
S31 - Upper Forward Fuselage0.25
S32 - Tailcone Attach14.75
S33 - Baggage Area28
S34 - Baggage Door8
S35 - Access & Floors7.75
S36 - Brake Lines4.5
S37 - Fuel System11.5
S38 - Rudder Pedals & Brake System13
S39 - Control System10.75
S40 - Flap System5
S41 - Upper Forward Fuselage Installation9
S42 - Rear Seat Backs7.5
S43 - Cabin3.5
S46 - Engine Mount & Gear0.75
S49 - Seats12
S50 - Cabin Heat1
Total836.25

Recent Posts

  • Spin Awareness Training Done
  • CFI Writtens Complete
  • Commercial Checkride Passed!
  • More Sanding and Rearranging the Workshop
  • Additional Entry Sanding

Recent Comments

  1. Mustang on Andair Fuel Selector Fuel Lines Connected

Archives

  • March 2026
  • February 2026
  • December 2025
  • November 2025
  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • February 2025
  • January 2025
  • December 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • January 2023
  • December 2022
  • September 2022
  • August 2022
  • April 2022
  • March 2022
  • December 2021
  • November 2021
  • June 2021
  • May 2021
  • April 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • July 2020
  • June 2020
  • May 2020

Categories

  • Avionics
  • Controls
  • Costs
  • Empennage
  • Firewall
  • Fuel System
  • Fuselage
  • Landing Gear
  • Lighting
  • Research
  • Tools
  • Training
  • Travel
  • Uncategorized
  • Wings
  • Workshop
Hestia | Developed by ThemeIsle