Quickbuild Review Logging – Section 25
I decided I’m going to log each section that was to be done by the QB team just so I have it documented that I reviewed each step. Luckily this section was fairly easy to review still. So there will Read more
I decided I’m going to log each section that was to be done by the QB team just so I have it documented that I reviewed each step. Luckily this section was fairly easy to review still. So there will Read more
I got the parts I needed 3D printed from Allan Glen’s website. I printed them in polycarbonate which felt really rigid. I installed them and got the conducting run and trimmed. My antennas will be arriving tomorrow as well as Read more
I didn’t spend too much time today on the build. I feel like I’ve been making so much progress recently I really need to sit down and do proper planning so I don’t seal something up that I need access Read more
I decided I could at least get the rear floorboards installed while I’m finishing my planning for the conduit runs under the rear seats/baggage area. That was a bigger pain than I expected LOL They had solid rivets for the Read more
Wrapping up this section for now and I will come back to it at a later date. I fabricated all four of the rudder cable linkages and got them installed. I will need to remove them later when I have Read more
I installed the steel braided lines which wasn’t too difficult since it is basically just screwing on both ends. The flexible lines were a bit more of a pain. The brass ferrules that needed to be installed in the ends Read more
Ok, I ended up having more time than I expected. By the time we got to the game we were only 20ish minutes away from kickoff and parking was now way too far away so I dropped the family off Read more
I didn’t get a ton of time today as I have a baptism that I get to attend and then my son is playing in the OU band tonight for their high school recruitment night so I got as much Read more
While I’m still waiting to decide on what fuel system I want to use, I went ahead and started section 37 which is the installation of the rudder pedals, brake cylinders, and rudder cabling. So the title pretty much wraps Read more
I realized as I was going back through the sections and double checking their work that they didn’t do two things. One was install the front floor boards permanently and two was to secure the rear vents. I got both Read more