983RV Life983RV Life
  • Build Log
  • Research
  • Additional Builders
  • Travel

Blog

Empennage

Left Elevator Deburring

I got almost all of the deburring done on the left elevator. I noticed that I had forgotten to prep the edge of the lightening circles on the front spar, so I got that done. I redid some of the Read more

By Olan Hodges, 4 years ago
Empennage

Elevator Trim Access Panel Prep

After I had finished all of the match drilling yesterday, it was time to work on these access panels before it has to be entirely disassembled. I did both the left and right elevator since my missing hardware does not Read more

By Olan Hodges, 4 years ago
Empennage

Full Assembly and Match-drilling

I got all of the pieces done and assembled and match drilled up to Page 9-8 Step 3. Even though these are just like the rudder in a way, they have quite a few more pieces in total since you Read more

By Olan Hodges, 4 years ago
Empennage

Elevators – Pages 9-3 through 9-6

I got quite quite a bit of clecoing done today as well as a little bit of the match drilling. The coolest part was doing the tab bends on the E-1001A & B skins. Using the mushroom bit in the Read more

By Olan Hodges, 4 years ago
Empennage

Deburring, Fluting, and Initial Assembly

I spent quite a bit of time going through and deburring all of the elevator pieces minus the large skin edges. That took the most time out of all of this. I then worked on the 903 and 904 pieces Read more

By Olan Hodges, 4 years ago
Empennage

Starting on the Elevators

My son and I found all of the elevator parts in the attic and brought them down to start working on them. I’m not including the searching and inventory time in yesterday’s work. We got all of the protective plastic Read more

By Olan Hodges, 4 years ago
Empennage

Horizontal Stabilizer Finished!

Oh man, this was a TON of riveting. My previous sections didn’t have this many rivets, but it was very rewarding! After I got caught up and then some on Friday after work, I really dug in all day Saturday Read more

By Olan Hodges, 4 years ago
Empennage

More HS Skin Riveting

It has been a long while since I last worked on the plane. I’ve not had much time and I probably need to see how best to use an hour here and there to do this build. I had a Read more

By Olan Hodges, 4 years ago
Empennage

Partial Assembly of HS Completed

I did quite a bit of work over this weekend. I finished all of the deburring on Friday night (6/11/2021) and got everything ready for priming the next morning. I primed all of the parts and then while the paint Read more

By Olan Hodges, 5 years ago
Research

Detailed Avionics, Paint, and Interior Research

I was trying to get everything more fleshed out in terms of how things will look in the interior, exterior, avionics, etc. Specifically with the avionics as I want to make sure that if I need to install any servos, Read more

By Olan Hodges, 5 years ago

Posts pagination

Previous 1 … 32 33 34 … 39 Next

Aircraft Build Time

Airplane sectionBuild time (hrs)
Avionics/Electronics18.25
S06 - Vertical Stabilizer22.5
S07 - Rudder34.25
S08 - Horizontal Stabilizer49.75
S09 - Elevators59
S10 - Tailcone75.75
S11 - Empennage Attach27.75
S12 - Empennage Fairings26.5
S13 - Main Spar18.25
S14 - Wing Ribs35.5
S15 - Rear Spar29.25
S16 - Top Skins32.75
S17 - Outboard Leading Edge34.75
S18 - Fuel Tank79.5
S20 - Bottom Skins42.25
S21 - Aileron35.5
S22 - Flap44
S23 - Aileron Actuation11
S24 - Wing Tip Installation15.5
S25 - Mid Fuselage Bulkheads0.25
S26 - Mid Fuselage Ribs Bottom Skins0.25
S27 - Firewall0.25
S28 - Forward Fuselage Bulkhead Ribs0.25
S29 - Fuselage Side Skins4
S30 - Step Installation2
S31 - Upper Forward Fuselage0.25
S32 - Tailcone Attach14.75
S33 - Baggage Area28
S34 - Baggage Door8
S35 - Access & Floors7.75
S36 - Brake Lines4.5
S37 - Fuel System11.5
S38 - Rudder Pedals & Brake System13
S39 - Control System10.75
S40 - Flap System5
S41 - Upper Forward Fuselage Installation9
S42 - Rear Seat Backs7.5
S43 - Cabin3.5
S46 - Engine Mount & Gear0.75
S49 - Seats12
S50 - Cabin Heat1
Total836.25

Recent Posts

  • Spin Awareness Training Done
  • CFI Writtens Complete
  • Commercial Checkride Passed!
  • More Sanding and Rearranging the Workshop
  • Additional Entry Sanding

Recent Comments

  1. Mustang on Andair Fuel Selector Fuel Lines Connected

Archives

  • March 2026
  • February 2026
  • December 2025
  • November 2025
  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • February 2025
  • January 2025
  • December 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • January 2023
  • December 2022
  • September 2022
  • August 2022
  • April 2022
  • March 2022
  • December 2021
  • November 2021
  • June 2021
  • May 2021
  • April 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • July 2020
  • June 2020
  • May 2020

Categories

  • Avionics
  • Controls
  • Costs
  • Empennage
  • Firewall
  • Fuel System
  • Fuselage
  • Landing Gear
  • Lighting
  • Research
  • Tools
  • Training
  • Travel
  • Uncategorized
  • Wings
  • Workshop
Hestia | Developed by ThemeIsle