Baggage Conduits Complete

I got the parts I needed 3D printed from Allan Glen’s website. I printed them in polycarbonate which felt really rigid. I installed them and got the conducting run and trimmed. My antennas will be arriving tomorrow as well as the coax cabling which will complete everything I will be Read more

Rear Floorboards Installed

I decided I could at least get the rear floorboards installed while I’m finishing my planning for the conduit runs under the rear seats/baggage area. That was a bigger pain than I expected LOL They had solid rivets for the flanges on the sides and rear. There wasn’t an easy Read more

Front Floorboards Installed

I realized as I was going back through the sections and double checking their work that they didn’t do two things. One was install the front floor boards permanently and two was to secure the rear vents. I got both of those done today though it took quite a bit Read more