983RV Life983RV Life
  • Build Log
  • Research
  • Additional Builders
  • Travel

Olan Hodges

Wings

Leading Edge Deburring Complete – Dimpling Begins

I got all of the deburring done today. I also got all of the ribs, J channels, and the outside portions of the skins dimpled. I setup the C frame to start dimpling the interior holes on the skins since it has the longer reach. Once I’m done with the Read more

By Olan Hodges, 6 months ago
Wings

More Leading Edge Deburring

I know it sounds boring but I find it relaxing getting these pieces cleaned up so they are smooth lol. I got all of the skins and the J channel stiffeners done and I’m a little over halfway done on the ribs. I forgot I needed to get the flanges Read more

By Olan Hodges, 6 months ago
Wings

Deburring & Countersinking Right Leading Edge

After my guitar lesson tonight I got a good amount of time to get some work done. I deburred all of the holes on the right leading edge and also got the countersinking done for the splice strip. I hope to get some time tomorrow to at least get some Read more

By Olan Hodges, 6 months ago
Wings

Holes Drilled for Leading Edges

I double checked a large handful of holes and they are definitely final sized which saves me about and hour to an hour and a half of work. I did drill the screw holes as those were not final sized. I didn’t get much time tonight as my son and Read more

By Olan Hodges, 6 months ago
Wings

Top Skins Finished

I finally got time with Brendon to finish the top skins. Luckily it didn’t take too long and we were done as I hate doing work on Sundays.

By Olan Hodges, 7 months ago
Wings

Leading Edges Assembled and J Channel Match Drilled

I got all of the ribs assembled into the leading edge skins today. I need to go back and smooth the forward edges some more on more of the ribs but I can do that when I’m disassembling them. I also got the J channels installed and match drilled them Read more

By Olan Hodges, 7 months ago
Wings

Modified Leading Edge Ribs and Cradle

I got the leading edge modified ribs cut and deburred today. I also got some time today to cut the cradle parts and get them put together. I wanted to get that done today so that I can work on things tomorrow while it is raining outside without having to Read more

By Olan Hodges, 7 months ago
Wings

Leading Edge J Channel and Splice Strip Work

I got the J channels cut to length, deburred and marked today. I also got the splice strips cut off of the tank skins that I have stored in the attic and got them deburred as well. Not alot of work done today but I didn’t have a ton of Read more

By Olan Hodges, 7 months ago
Wings

Leading Edge Ribs Straightened and Fluted

I had extra time while on calls and during breaks to finish this work. Only took another hour and 15. I need to look at what step is next and get started on that but that will have to wait till tomorrow. I gave the builder’s number a call at Read more

By Olan Hodges, 7 months ago
Wings

Straightening & Fluting Leading Edge Ribs

Brendon was going to be doing band stuff tonight so I decided to take the night off with him. I’ll have to skip tomorrow night with him too since we have church tomorrow. I decided to go ahead with the next section and start straightening and fluting the ribs. It Read more

By Olan Hodges, 7 months ago

Posts pagination

Previous 1 … 18 19 20 … 39 Next

Aircraft Build Time

Airplane sectionBuild time (hrs)
Avionics/Electronics13.75
S06 - Vertical Stabilizer22.5
S07 - Rudder34.25
S08 - Horizontal Stabilizer49.75
S09 - Elevators59
S10 - Tailcone75.75
S11 - Empennage Attach27.75
S12 - Empennage Fairings26.5
S13 - Main Spar18.25
S14 - Wing Ribs35.5
S15 - Rear Spar29.25
S16 - Top Skins32.75
S17 - Outboard Leading Edge34.75
S18 - Fuel Tank79.5
S20 - Bottom Skins42.25
S21 - Aileron35.5
S22 - Flap44
S23 - Aileron Actuation11
S24 - Wing Tip Installation15.5
S25 - Mid Fuselage Bulkheads0.25
S26 - Mid Fuselage Ribs Bottom Skins0.25
S27 - Firewall0.25
S28 - Forward Fuselage Bulkhead Ribs0.25
S29 - Fuselage Side Skins4
S30 - Step Installation2
S31 - Upper Forward Fuselage0.25
S32 - Tailcone Attach14.75
S33 - Baggage Area28
S34 - Baggage Door8
S35 - Access & Floors7.75
S36 - Brake Lines4.5
S37 - Fuel System11.5
S38 - Rudder Pedals & Brake System13
S39 - Control System10.75
S40 - Flap System5
S41 - Upper Forward Fuselage Installation9
S42 - Rear Seat Backs7.5
S46 - Engine Mount & Gear0.75
S49 - Seats12
S50 - Cabin Heat1
Total828.25

Recent Posts

  • Andair Fuel Selector Fuel Lines Connected
  • Roll GSA 28 Wired
  • Andair Fuel Valve & Selector Mounted
  • Andair Custom Mount Plate
  • Andair Fuel Valve Has Arrived!

Recent Comments

No comments to show.

Archives

  • November 2025
  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • February 2025
  • January 2025
  • December 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • January 2023
  • December 2022
  • September 2022
  • August 2022
  • April 2022
  • March 2022
  • December 2021
  • November 2021
  • June 2021
  • May 2021
  • April 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • July 2020
  • June 2020
  • May 2020

Categories

  • Avionics
  • Controls
  • Costs
  • Empennage
  • Firewall
  • Fuel System
  • Fuselage
  • Landing Gear
  • Lighting
  • Research
  • Tools
  • Travel
  • Uncategorized
  • Wings
  • Workshop
Hestia | Developed by ThemeIsle