Tank Cleaning Day 2

First thing was the additional VA-141 3/8 NPT flanges came in today. Unfortunately one of them did not have threads all the way through like it is supposed to. I called Van’s to see if they are going to ship a replacement or if it is okay to tap it Read more

All Tank Ribs Installed

I got the rest of the 6 ribs installed today. It took me about 45 minutes each between cleaning, mixing, riveting, etc. Glad this is over with and I can move on to the other things like the J channel and bracket installs tomorrow.