Leading Edges Assembled and J Channel Match Drilled
I got all of the ribs assembled into the leading edge skins today. I need to go back and smooth the forward edges some more on more of the ribs but I can do that when I’m disassembling them. I also got the J channels installed and match drilled them Read more









