983RV Life983RV Life
  • Build Log
  • Research
  • Additional Builders
  • Travel

Fuel System

Fuel System

Left Wing Tank Stiffeners Almost Done

I’ve only got four more stiffeners to complete on this side. It was basically rinse and repeat for each stiffener. I hope to get the other stiffeners done on both sides by Wednesday but I have somethings I’m doing tomorrow night so fingers crossed I get the time.

By olanandkate, 2 weeksJune 9, 2025 ago
Fuel System

Prepping for Tank Stiffener Install

I took a little bit of time today before going to bed to make sure the sealant I had installed yesterday was curing well. It is definitely cured pretty well since it is pretty warm outside. I cleaned up a little bit that I did not cleanup yesterday. Luckily it Read more…

By olanandkate, 2 weeksJune 8, 2025 ago
Fuel System

Fuel Cap, Quick Drain, and End Ribs Sealed

It was quite a learning experience today. I got the end ribs done first. I realized quickly that the sealant is very hard to control and gets EVERYWHERE. I had done it in small quantities for the rudder and other components but it was at the very end of the Read more…

By olanandkate, 2 weeksJune 7, 2025 ago
Fuel System

Tank Assembly Prep

I realized I didn’t scuff up the edges of the ribs. I went back and did that. I hope I was able to scuff it up enough in the dimples but I’m pretty sure I did. I also made and bought some tools to help with the sealant process that Read more…

By olanandkate, 2 weeksJune 6, 2025 ago
Fuel System

Tank Dimpling & Countersinking Complete

I decided to start reading further ahead in the manual and see what this attach bracket actually supports. It doesn’t attach to the fuselage and as I was looking through the wing attach section I saw on page 44-2 figure 3 that they specifically call out those holes I was Read more…

By olanandkate, 2 weeksJune 5, 2025 ago
Fuel System

Left Tank Fully Deburred and Some Countersinking

I got all of the deburring done, I got some countersinking done, and I also got some dimpling done. Just alot of “mindless” tasks as you watch some shows and work. lol I do need to talk with Van’s tomorrow just to confirm if I countersink both the skin and Read more…

By olanandkate, 3 weeksJune 4, 2025 ago
Fuel System

Left Tank Disassembled and Partially Deburred

I didn’t get a ton of time today but I did get the left tank marked and then disassembled. I deburred the holes from the rib flanges to the skins and I also deburred the J channel since I drilled new holes in it. I need to go through the Read more…

By olanandkate, 3 weeksJune 3, 2025 ago
Fuel System

Right Tank J Stiffener

While I was in Florida, the J stiffener arrived. I got it cut, deburred, marked, and drilled today. I think I’m going to stop here on the gas tanks until I can get the tank seal as I want to keep the tank parts as condensed as possible since I’m Read more…

By olanandkate, 4 weeksMay 24, 2025 ago
Fuel System

Wing Shims Cut/Deburred and Pitot Tube Planning

I probably won’t get much time to work on the plane for the next week and a half because of work travel and other items. But we’ll see. I did finally find the wing shims. I didn’t dig deep enough into my small parts box. It was at the bottom Read more…

By olanandkate, 1 monthMay 14, 2025 ago
Fuel System

Tanks Prepared for Disassembly

I got the left tank 100% complete for disassembly and dimpling. I got the right tank to the same spot also but since I am missing the J channel I’ll have to leave it where it is at until I can get that done. Luckily they shipped it today so Read more…

By olanandkate, 1 monthMay 13, 2025 ago

Posts pagination

Previous 1 2 3 Next

Aircraft Build Time

Airplane sectionBuild time (hrs)
S06 - Vertical Stabilizer22.5
S07 - Rudder34.25
S08 - Horizontal Stabilizer49.75
S09 - Elevators59
S10 - Tailcone75.75
S11 - Empennage Attach27.75
S12 - Empennage Fairings26.5
S13 - Main Spar18.25
S14 - Wing Ribs35.5
S15 - Rear Spar29.25
S16 - Top Skins32.75
S17 - Outboard Leading Edge34.75
S18 - Fuel Tank52
S21 - Aileron35
Total533
Recent Posts
  • Tanks Ready for Inspection and Sealing!
  • Left Tank J Stiffener and Both Forward Brackets Done
  • Right Tank J Stiffener Installed
  • All Tank Ribs Installed
  • More Tank Ribs Installed
Recent Comments
    Archives
    • June 2025
    • May 2025
    • April 2025
    • February 2025
    • January 2025
    • December 2024
    • October 2024
    • September 2024
    • August 2024
    • July 2024
    • September 2023
    • August 2023
    • July 2023
    • June 2023
    • May 2023
    • January 2023
    • December 2022
    • September 2022
    • August 2022
    • April 2022
    • March 2022
    • December 2021
    • November 2021
    • June 2021
    • May 2021
    • April 2021
    • February 2021
    • January 2021
    • December 2020
    • November 2020
    • October 2020
    • September 2020
    • July 2020
    • June 2020
    • May 2020
    Categories
    • Costs
    • Empennage
    • Fuel System
    • Research
    • Tools
    • Travel
    • Uncategorized
    • Wings
    • Workshop
    Hestia | Developed by ThemeIsle