Let the Fluting Begin!

I was only able to get a few ribs fluted tonight and straightened with the 30 minutes I had tonight after doing my preassessment exam for my accounting class for my MBA. These were way better than my horizontal stabilizer ribs. I only had to make a few corrections so Read more

Main Spar Completed!

I got started early this morning and finished the tie down attachments, primed everything, and then riveted it all together and torqued the bolts down. I got all of the parts for the next section out from the attic and I’m ready to move on to section 14! One thing Read more

J-Channels Completed

I finally got both flanges with the J-channels completed as well as drilled out the rest of the holes that the instructions asked me to. Took quite a bit with all the clecos but it is done.

Spar Extensions Installed

I got the spar extension parts deburred and primed. I also went ahead and cut all of the J channel stiffeners but I realized it was going to take alot more work to get those ready for priming so I put them to the side and riveted the extensions on Read more

Wings Started!

I had my boys help me get the spars out of the attic and I started work on that. I started match drilling the parts but they were already final sized. I forgot that quite a few parts from this wing kit are already final sized. They did need some Read more

Empennage Finished & Stored

I finally got everything put back together and checked all of the control throws and everything looked great! The elevator goes a few degrees beyond the expected amount. The one odd part I’m going to have to figure out is that I am unable to get the 35 degrees of Read more