olanandkate

Empennage

Pushrod Prep

I got all of the prep work done for the push rod today. I just need to get some primer on the inside tomorrow, rivet it together and install it. I also got a good hack from the Facebook group. I was having trouble getting my spacing washers installed for Read more…

By olanandkate, 2 yearsAugust 12, 2023 ago
Empennage

Vertical Stabilizer Attached & Rudder Stop SB Completed

I had bought the rudder stop service bulletin hardware a while ago, but just hadn’t executed on it yet since it was up in the attic. I knew I would pull it down at sometime so I just waited. I finally got that done which we can see the completed Read more…

By olanandkate, 2 yearsAugust 11, 2023 ago
Empennage

Horizontal Stabilizer Attached

I got all of the work done to attach the horizontal stabilizer today. I saw that I did not trim down the shims on the forward portion of the horizontal stabilizer properly so I spent some time reshaping those. Luckily I had to remove more material so it wasn’t a Read more…

By olanandkate, 2 yearsAugust 9, 2023 ago
Empennage

Control Horns Drilled & VS Attach Point Ready

I got the control horns drilled, the vertical stabilizer forward attachment point prepped, and I also got all of the horizontal stabilizer spacers cut and stuck on to the forward horizontal stabilizer brace attachment points. I’ll have to figure out where to put the rest of the parts before I Read more…

By olanandkate, 2 yearsAugust 8, 2023 ago
Empennage

Elevator Control Horn Initial Drilling

I didn’t get too much time yesterday but I did go back and tighten up the lock nuts for the elevator threaded rod end bearings that I forgot to do the other day on the elevators. I also found a piece of wood that was exactly the width I needed Read more…

By olanandkate, 2 yearsAugust 7, 2023 ago
Empennage

Elevators Aligned & Installed

Over the past few days I’ve worked here and there to get both the left and right elevators straight and the control horns drilled. I was surprised that the drill bushing was not only larger in diameter (which they warned us about) but I also had to figure a way Read more…

By olanandkate, 2 yearsAugust 4, 2023 ago
Empennage

Left Elevator Initial Attachment

I didn’t get alot of time to work on the plane this weekend with all of the church and band activities we participated in. I did get the left elevator attached and measured the gap along the counter balance. It is 1/16″ wider at the front than at the back. Read more…

By olanandkate, 2 yearsJuly 31, 2023 ago
Empennage

Empennage Attach Step 1

I decided to go on ahead and go through the empennage attach section since I’m still waiting on Van’s to get back with me on the elevator tab template. I also don’t want to pull all of the wing parts out just yet since I was reviewing the parts I Read more…

By olanandkate, 2 yearsJuly 28, 2023 ago
Empennage

Redoing Elevator Trim Tabs – Drilling Rivets Out

Got my first hour of rework done on the trim tabs. I needed to recover some of the parts that I could salvage which was the hinge and the clevis horn components. I hit Vans up for a PDF of the foam rib templates so hopefully they answer tomorrow so Read more…

By olanandkate, 2 yearsJuly 27, 2023 ago
Empennage

Tailcone Complete!

Andrew and I got the final line of rivets done and I installed the seat belt harnesses. Ready to move back to redoing the elevator trim tabs!

By olanandkate, 2 yearsJuly 25, 2023 ago

Posts pagination

Previous 1 … 14 15 16 … 26 Next

Aircraft Build Time

Airplane sectionBuild time (hrs)
S06 - Vertical Stabilizer22.5
S07 - Rudder34.25
S08 - Horizontal Stabilizer49.75
S09 - Elevators59
S10 - Tailcone75.75
S11 - Empennage Attach27.75
S12 - Empennage Fairings26.5
S13 - Main Spar18.25
S14 - Wing Ribs35.5
S15 - Rear Spar29.25
S16 - Top Skins32.75
S17 - Outboard Leading Edge34.75
S18 - Fuel Tank66.5
S21 - Aileron35
S22 - Flap5.5
Total553
Recent Posts
  • Flaps Initial Assembly
  • Tank Tests – One Good One Bad
  • First Day of Flap Building
  • Tanks complete and ready for pressure testing
  • Tanks Fully Assembled (Almost)
Recent Comments
    Archives
    • July 2025
    • June 2025
    • May 2025
    • April 2025
    • February 2025
    • January 2025
    • December 2024
    • October 2024
    • September 2024
    • August 2024
    • July 2024
    • September 2023
    • August 2023
    • July 2023
    • June 2023
    • May 2023
    • January 2023
    • December 2022
    • September 2022
    • August 2022
    • April 2022
    • March 2022
    • December 2021
    • November 2021
    • June 2021
    • May 2021
    • April 2021
    • February 2021
    • January 2021
    • December 2020
    • November 2020
    • October 2020
    • September 2020
    • July 2020
    • June 2020
    • May 2020
    Categories
    • Costs
    • Empennage
    • Fuel System
    • Research
    • Tools
    • Travel
    • Uncategorized
    • Wings
    • Workshop
    Hestia | Developed by ThemeIsle