Control Column Bolted and Control Sticks Measured

Published by olanandkate on

I didn’t get much done today but I got something. I bolted the control column to the elevator mid push tube assembly and got the safety wire in place. I then measured the control sticks to make sure they were equal distance. I adjusted it a bit as it was 3/32 out from each other comparing the top and bottom measurements. I ordered both of the remaining servos to get that done. I wanted to make sure all of the control surface components were ordered and installed so I could make sure everything played well together. I am still contemplating on whether I’m going to have aileron trim but for how simple it is I might just do it. The last thing I need to do for this section is to put the elevator bell crank in its neutral position and validate that the control column is at the correct location and this section will be done.


0 Comments

Leave a Reply

Avatar placeholder

Your email address will not be published. Required fields are marked *