Starting the Tailcone

Published by olanandkate on

I dragged all of the parts from the attic and started on the tailcone. I had to order a 3/8 – 16 tap as I don’t really keep an assortment of taps around unless I need one. I got the first three steps done and I need to start cutting the angle material and J channel material for the next step.

One side of the rear assembly
And the other side

0 Comments

Leave a Reply

Avatar placeholder

Your email address will not be published. Required fields are marked *