Front Floorboards Installed
I realized as I was going back through the sections and double checking their work that they didn’t do two things. One was install the front floor boards permanently and two was to secure the rear vents. I got both of those done today though it took quite a bit of time just because of how many rivets there were and the angles that they were at. Good to have it done and secure now!


0 Comments