Empennage

Elevators – Pages 9-3 through 9-6

I got quite quite a bit of clecoing done today as well as a little bit of the match drilling. The coolest part was doing the tab bends on the E-1001A & B skins. Using the mushroom bit in the rivet gun worked like a champ on getting those bends Read more

By olanandkate, 4 yearsNovember 27, 2021 ago
Empennage

Deburring, Fluting, and Initial Assembly

I spent quite a bit of time going through and deburring all of the elevator pieces minus the large skin edges. That took the most time out of all of this. I then worked on the 903 and 904 pieces to get them straight and level. Mine came pre-fluted but Read more

By olanandkate, 4 yearsNovember 25, 2021 ago
Empennage

Starting on the Elevators

My son and I found all of the elevator parts in the attic and brought them down to start working on them. I’m not including the searching and inventory time in yesterday’s work. We got all of the protective plastic off of them and I cut the ribs per the Read more

By olanandkate, 4 yearsNovember 24, 2021 ago
Empennage

Horizontal Stabilizer Finished!

Oh man, this was a TON of riveting. My previous sections didn’t have this many rivets, but it was very rewarding! After I got caught up and then some on Friday after work, I really dug in all day Saturday and a little bit on Sunday. This was all riveting Read more

By olanandkate, 4 yearsNovember 21, 2021 ago
Empennage

More HS Skin Riveting

It has been a long while since I last worked on the plane. I’ve not had much time and I probably need to see how best to use an hour here and there to do this build. I had a good three hours today (11/19/2021) so I got after it. Read more

By olanandkate, 4 yearsNovember 20, 2021 ago

Aircraft Build Time

Airplane sectionBuild time (hrs)
Avionics/Electronics9
S06 - Vertical Stabilizer22.5
S07 - Rudder34.25
S08 - Horizontal Stabilizer49.75
S09 - Elevators59
S10 - Tailcone75.75
S11 - Empennage Attach27.75
S12 - Empennage Fairings26.5
S13 - Main Spar18.25
S14 - Wing Ribs35.5
S15 - Rear Spar29.25
S16 - Top Skins32.75
S17 - Outboard Leading Edge34.75
S18 - Fuel Tank79.5
S20 - Bottom Skins42.25
S21 - Aileron35.5
S22 - Flap44
S23 - Aileron Actuation11
S24 - Wing Tip Installation14.5
S29 - Fuselage Side Skins4
S30 - Step Installation2
S32 - Tailcone Attach14.75
S36 - Brake Lines4.5
S38 - Rudder Pedals & Brake System9.5
Total716.5
Recent Posts
  • Rudder Pedals Installed and Rudder Cables Ran
  • Rudder Pedals Assembled
  • Rudder Pedals Cut, Deburred, and Primed
  • Front Floorboards Installed
  • Brake Lines Complete (Almost)
Recent Comments
    Archives
    • August 2025
    • July 2025
    • June 2025
    • May 2025
    • April 2025
    • February 2025
    • January 2025
    • December 2024
    • October 2024
    • September 2024
    • August 2024
    • July 2024
    • September 2023
    • August 2023
    • July 2023
    • June 2023
    • May 2023
    • January 2023
    • December 2022
    • September 2022
    • August 2022
    • April 2022
    • March 2022
    • December 2021
    • November 2021
    • June 2021
    • May 2021
    • April 2021
    • February 2021
    • January 2021
    • December 2020
    • November 2020
    • October 2020
    • September 2020
    • July 2020
    • June 2020
    • May 2020
    Categories
    • Avionics
    • Costs
    • Empennage
    • Fuel System
    • Fuselage
    • Research
    • Tools
    • Travel
    • Uncategorized
    • Wings
    • Workshop
    Hestia | Developed by ThemeIsle