Seat Rail Install

I decided to get the seat rails installed today since my servos didn’t arrive today. I got the rails installed for the most part. I am missing one of the nuts that dropped in the fuselage so I’ll have to dig around and try to find that. And then one Read more

Controls Installed

Vans gave me an answer that I would need to massage it. Apparently these parts have issues as I’ve seen some on the Facebook RV-10 group all the way back to 2021. So I shaved the amount of material necessary off the rear portion of the control stick base and Read more

Front Seats Started

Since I’m waiting on Vans to report back on the control column, and everything else required too much time to start working on, I decided to start working on the front seats. I can get them ready and put them to the side when I’m done with them. I should Read more

Fuel System Complete!

I finished the last two lines of the fuel system this morning. The one that took the longest was the short one. Those are seriously the hardest ones to make because there is no room for error, and trying to measure the distance between offsetting lines is difficult because you Read more