983RV Life983RV Life
  • Build Log
  • Research
  • Additional Builders
  • Travel

Olan Hodges

Fuel System

More Tank Part Deburring

Just more edge and hole deburring. This was a good way to destress from the past few days. The ribs in this photo still need the edge rivet holes deburred and then I need to deburr the parts on the back edge of the table still. But the parts next Read more

By Olan Hodges, 6 months ago
Fuel System

Tank Ribs Straightened and Zee Brackets and Stiffeners Separated and Deburring Started

Long title but I try to put what I did in the title. I got all of the tank ribs deburred today. It only took another hour to finish that. I then separated all of the zee brackets and tank skin stiffeners and started deburring some of them.

By Olan Hodges, 6 months ago
Fuel System

Straightening Tank Ribs Day 1

Here are all of the wings parts gathered for the next section of assembly. I had on and off again time to work on the ribs. That’s why I think this took me longer than usual as I kept getting interrupted. Either way I got 10 of the ribs done Read more

By Olan Hodges, 6 months ago
Wings

Section 17 – Outboard Leading Edges Complete

The boys were both busy today so I decided to see if my wife could help. She did an excellent job and bucked the rivets like a champ! I’ve got all of the gas tank parts down from the attic so I can start on that tomorrow.

By Olan Hodges, 6 months ago
Wings

Right Leading Edge Partially Riveted

I got the wing moved over and I modified the wing stand so that it has the carpet sling to hold the leading edge. I then got the leading edge almost completely riveted but I didn’t have anyone to buck the other portion. Hopefully I’ll get one of the boys Read more

By Olan Hodges, 6 months ago
Wings

Left Wing Leading Edge Complete

I didn’t get a lot of time tonight but I did get Andrew and finish setting the remaining rivets on the left leading edge. I plan to get a good portion of the right wing done tomorrow.

By Olan Hodges, 6 months ago
Wings

Left Leading Edge Almost Installed

I got most of the work done. Brendon seemed a bit out of it so I didn’t want to push him too much tonight to help me. Just have the top row of rivets to set and this leading edge will be fully installed.

By Olan Hodges, 6 months ago
Wings

Leading Edges Riveted

The leading edge assemblies are now done. Now I just need to attach them to the wing assemblies.

By Olan Hodges, 6 months ago
Wings

Right Leading Edge Riveting Continued

More riveting. Not much to call out except I’ve been working my way forward per the instructions in the manual.

By Olan Hodges, 6 months ago
Wings

Leading Edge Dimpling & Priming Completed – Initial Rivets Driven

I got all of the dimpling and priming done today. I also got the first two rivets on each rib set as well. I staged some so I could move quicker tomorrow but we’ll see how much time I get tomorrow as I have quite a few church meetings on Read more

By Olan Hodges, 6 months ago

Posts pagination

Previous 1 … 17 18 19 … 39 Next

Aircraft Build Time

Airplane sectionBuild time (hrs)
Avionics/Electronics13.75
S06 - Vertical Stabilizer22.5
S07 - Rudder34.25
S08 - Horizontal Stabilizer49.75
S09 - Elevators59
S10 - Tailcone75.75
S11 - Empennage Attach27.75
S12 - Empennage Fairings26.5
S13 - Main Spar18.25
S14 - Wing Ribs35.5
S15 - Rear Spar29.25
S16 - Top Skins32.75
S17 - Outboard Leading Edge34.75
S18 - Fuel Tank79.5
S20 - Bottom Skins42.25
S21 - Aileron35.5
S22 - Flap44
S23 - Aileron Actuation11
S24 - Wing Tip Installation15.5
S25 - Mid Fuselage Bulkheads0.25
S26 - Mid Fuselage Ribs Bottom Skins0.25
S27 - Firewall0.25
S28 - Forward Fuselage Bulkhead Ribs0.25
S29 - Fuselage Side Skins4
S30 - Step Installation2
S31 - Upper Forward Fuselage0.25
S32 - Tailcone Attach14.75
S33 - Baggage Area28
S34 - Baggage Door8
S35 - Access & Floors7.75
S36 - Brake Lines4.5
S37 - Fuel System11.5
S38 - Rudder Pedals & Brake System13
S39 - Control System10.75
S40 - Flap System5
S41 - Upper Forward Fuselage Installation9
S42 - Rear Seat Backs7.5
S46 - Engine Mount & Gear0.75
S49 - Seats12
S50 - Cabin Heat1
Total828.25

Recent Posts

  • Andair Fuel Selector Fuel Lines Connected
  • Roll GSA 28 Wired
  • Andair Fuel Valve & Selector Mounted
  • Andair Custom Mount Plate
  • Andair Fuel Valve Has Arrived!

Recent Comments

No comments to show.

Archives

  • November 2025
  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • February 2025
  • January 2025
  • December 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • January 2023
  • December 2022
  • September 2022
  • August 2022
  • April 2022
  • March 2022
  • December 2021
  • November 2021
  • June 2021
  • May 2021
  • April 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • July 2020
  • June 2020
  • May 2020

Categories

  • Avionics
  • Controls
  • Costs
  • Empennage
  • Firewall
  • Fuel System
  • Fuselage
  • Landing Gear
  • Lighting
  • Research
  • Tools
  • Travel
  • Uncategorized
  • Wings
  • Workshop
Hestia | Developed by ThemeIsle