983RV Life983RV Life
  • Build Log
  • Research
  • Additional Builders
  • Travel

olanandkate

Empennage

Final Drilling Everything and Installing the Upper Skins

This was a long day LOL. I spent 8 hours in total across Saturday (6) and Sunday (2) to get this far. It looks great and I am hoping to get through the rest of the initial assembly by the end of this week. We’ll see as I had originally Read more…

By olanandkate, 2 yearsJanuary 22, 2023 ago
Empennage

Tailcone Straightening

I got started on the rear bulkhead and there is a piece you need to manufacture that braces between the rear bulkhead and the rudder stop stiffeners. I got it cut out and was preparing for drilling when I saw that the tailcone had a slight twist in it. I Read more…

By olanandkate, 2 yearsJanuary 21, 2023 ago
Empennage

Tailcone Right Side Drilled and Rudder Stop Stiffners Installed

Over two days I was able to get the rear bulkheads situation fixed with some shaping of the tabs on the bulkheads and I drilled all of the holes for the stiffeners. I also got the rudder stop stiffeners cut and installed. I now just need to work through cutting Read more…

By olanandkate, 2 yearsJanuary 19, 2023 ago
Empennage

Tailcone Initial Assembly

The tailcone is mostly assembled now. I got the bottom and right hand side drilled. I still have to drill the stiffeners on the left hand side but I at least got it put on. I also got the longerons bent and shaped the way they asked. I am having Read more…

By olanandkate, 2 yearsJanuary 17, 2023 ago
Empennage

Tailcone Stiffeners

This has taken quite a bit of work. I could only think of a cutoff wheel to cut these stiffeners but I did not like the inaccuracy of the cuts. I tried to keep it as close to 45 degrees as much as possible but doing this free hand was Read more…

By olanandkate, 2 yearsJanuary 13, 2023 ago
Empennage

More Tailcone Deburring

I’ve spent a lot of time recently getting our RV setup. Now that that is done and we are just enjoying it I have a little more time on my hands. I’ve spent a lot of time deburring these tailcone parts which take a lot of time just because of Read more…

By olanandkate, 3 yearsDecember 7, 2022 ago
Wings

The Wing Kit Has Arrived!

I was super excited when I got the call on Wednesday that they wanted to schedule delivery at the house. Luckily this time there weren’t any issues and they showed up on the date they said they would and the crate was beaten up but nothing inside was damaged. I Read more…

By olanandkate, 3 yearsSeptember 10, 2022 ago
Empennage

Starting the Tailcone

I dragged all of the parts from the attic and started on the tailcone. I had to order a 3/8 – 16 tap as I don’t really keep an assortment of taps around unless I need one. I got the first three steps done and I need to start cutting Read more…

By olanandkate, 3 yearsSeptember 3, 2022 ago
Empennage

Elevators Done!

I finally finished the elevators! I will have to come back and redo the trim tabs. It appears when I drilled the end rivet holes I got them off. There is a pretty bad twist in BOTH of the trim tabs. Not a big deal, I’ll just order new parts Read more…

By olanandkate, 3 yearsSeptember 3, 2022 ago
Empennage

Trim Tabs Sealed up and Hinge Partially Installed

I spent some time on Saturday and Sunday getting the trim tabs sealed up and I at least drilled the holes for the elevator side of the trim tab hinge. I’m going to have to wait until Thursday to do the rest of the hinge drilling on the trim tabs Read more…

By olanandkate, 3 yearsAugust 29, 2022 ago

Posts pagination

Previous 1 … 16 17 18 … 26 Next

Aircraft Build Time

Airplane sectionBuild time (hrs)
S06 - Vertical Stabilizer22.5
S07 - Rudder34.25
S08 - Horizontal Stabilizer49.75
S09 - Elevators59
S10 - Tailcone75.75
S11 - Empennage Attach27.75
S12 - Empennage Fairings26.5
S13 - Main Spar18.25
S14 - Wing Ribs35.5
S15 - Rear Spar29.25
S16 - Top Skins32.75
S17 - Outboard Leading Edge34.75
S18 - Fuel Tank66
S21 - Aileron35
Total547
Recent Posts
  • First Day of Flap Building
  • Tanks complete and ready for pressure testing
  • Tanks Fully Assembled (Almost)
  • Leak Testing Completed Successfully and Fuel Return Port
  • Leak Testing Before Closing Tanks
Recent Comments
    Archives
    • June 2025
    • May 2025
    • April 2025
    • February 2025
    • January 2025
    • December 2024
    • October 2024
    • September 2024
    • August 2024
    • July 2024
    • September 2023
    • August 2023
    • July 2023
    • June 2023
    • May 2023
    • January 2023
    • December 2022
    • September 2022
    • August 2022
    • April 2022
    • March 2022
    • December 2021
    • November 2021
    • June 2021
    • May 2021
    • April 2021
    • February 2021
    • January 2021
    • December 2020
    • November 2020
    • October 2020
    • September 2020
    • July 2020
    • June 2020
    • May 2020
    Categories
    • Costs
    • Empennage
    • Fuel System
    • Research
    • Tools
    • Travel
    • Uncategorized
    • Wings
    • Workshop
    Hestia | Developed by ThemeIsle