983RV Life983RV Life
  • Build Log
  • Research
  • Additional Builders
  • Travel

olanandkate

Wings

Wings Started!

I had my boys help me get the spars out of the attic and I started work on that. I started match drilling the parts but they were already final sized. I forgot that quite a few parts from this wing kit are already final sized. They did need some Read more…

By olanandkate, 11 monthsAugust 12, 2024 ago
Empennage

Empennage Finished & Stored

I finally got everything put back together and checked all of the control throws and everything looked great! The elevator goes a few degrees beyond the expected amount. The one odd part I’m going to have to figure out is that I am unable to get the 35 degrees of Read more…

By olanandkate, 11 monthsAugust 12, 2024 ago
Empennage

Fixing Elevator Trim Tab Bellcrank Mounts

I decided to go back and fix a mistake I made with the elevator trim bellcrank mounts. I was off when I drilled them and the elevator trim was not within specifications. I drilled out the rivets, threw the mounts away and built two new from scratch. This time they Read more…

By olanandkate, 11 monthsAugust 10, 2024 ago
Empennage

Even More Filler & Sanding

I did quite a bit of filler and sanding and I’m about as far as I want to get with it at this point. I’ll come back when the plane is nearing completing to get this done the way I want it.

By olanandkate, 11 monthsAugust 10, 2024 ago
Empennage

More Filler and Sanding

I spent most of my time today and yesterday filling the low spots and sanding. Not alot of an update here but wanted to include pictures. I do need to order some thin fiberglass so that I can glass over the edges between the fiberglass parts and the aluminum. I’ve Read more…

By olanandkate, 11 monthsAugust 9, 2024 ago
Empennage

VS Tip Fiberglassing Continues

I trimmed and sanded down the first two layers of glass and it definitely wasn’t thick enough to cover the rear gap. I added three more layers and that still didn’t add enough thickness but I wanted to go ahead and get the interior glass layers done first so I Read more…

By olanandkate, 11 monthsAugust 7, 2024 ago
Empennage

HS Tips Primed and Installed – VS Tip Fiberglass First Layers

I got the HS tips sanded, countersunk, cleaned, primed and installed tonight. I also got the fiberglass for the first two layers done for the VS tip tonight. Had to strap it down so it wouldn’t move on me as it was still wanting to bow in a few millimeters. Read more…

By olanandkate, 11 monthsAugust 5, 2024 ago
Research

Paint Scheme Possibility

I was looking at some of the Evoke scheme designs that they have publicly available after seeing their design work on the Van’s Aircraft RV-10 that was on display at Oshkosh this year. I really like this design though it is a bit darker than I would want. Maybe some Read more…

By olanandkate, 11 monthsAugust 5, 2024 ago
Empennage

Finishing Surface on HS Tips & Prepping VS Tip

I spent time getting the VS tip cut and match drilled so that I can get it ready to fiberglass the back. It didn’t take too terrible long to get it ready but did take quite a bit of heat and molding to get the shape right. It had sunken Read more…

By olanandkate, 11 monthsAugust 4, 2024 ago
Empennage

HS Tip Fairings Done

The horizontal stabilizer tips are now finished. It took a bit of getting over the fear of messing up the parts to start but I did it LOL. I formed foam to get the right shape to the outside layer. I wrapped it with AC duct tape but I forgot Read more…

By olanandkate, 11 monthsAugust 3, 2024 ago

Posts pagination

Previous 1 … 11 12 13 … 26 Next

Aircraft Build Time

Airplane sectionBuild time (hrs)
S06 - Vertical Stabilizer22.5
S07 - Rudder34.25
S08 - Horizontal Stabilizer49.75
S09 - Elevators59
S10 - Tailcone75.75
S11 - Empennage Attach27.75
S12 - Empennage Fairings26.5
S13 - Main Spar18.25
S14 - Wing Ribs35.5
S15 - Rear Spar29.25
S16 - Top Skins32.75
S17 - Outboard Leading Edge34.75
S18 - Fuel Tank66.5
S21 - Aileron35
S22 - Flap5.5
Total553
Recent Posts
  • Flaps Initial Assembly
  • Tank Tests – One Good One Bad
  • First Day of Flap Building
  • Tanks complete and ready for pressure testing
  • Tanks Fully Assembled (Almost)
Recent Comments
    Archives
    • July 2025
    • June 2025
    • May 2025
    • April 2025
    • February 2025
    • January 2025
    • December 2024
    • October 2024
    • September 2024
    • August 2024
    • July 2024
    • September 2023
    • August 2023
    • July 2023
    • June 2023
    • May 2023
    • January 2023
    • December 2022
    • September 2022
    • August 2022
    • April 2022
    • March 2022
    • December 2021
    • November 2021
    • June 2021
    • May 2021
    • April 2021
    • February 2021
    • January 2021
    • December 2020
    • November 2020
    • October 2020
    • September 2020
    • July 2020
    • June 2020
    • May 2020
    Categories
    • Costs
    • Empennage
    • Fuel System
    • Research
    • Tools
    • Travel
    • Uncategorized
    • Wings
    • Workshop
    Hestia | Developed by ThemeIsle