Left Elevator Fairing Installed
I decided to take the rest of Labor Day after finishing the empennage attach section to start working on the fairing. I focused on the left elevator since it was more easily accessible. A large majority of the time as dealt with shaping the fairing, both the surface of it as well as the depth of the flange. It looks good and I’ll start on the right elevator fairing tomorrow.
0 Comments