Counterbalance Drilling
I had some time before my flight this morning so I decided to be productive and get those holes drilled. I put the skin back on and drilled all of the holes. Next is to Read more…
With a payload capacity roughly around 1070 - 1180lbs and a seating capacity of four people, this met the mission goals we had set of traveling with family or being able to carry heavier payloads.
The speed that the Van's Aircraft line up provides was something I could not pass up. Our mission is to travel with our family to multiple places around North/Central America. This provided us with the ability to get further in a shorter amount of time.
The support community for Van's Aircraft is huge. Most of the EAA members that I've talked to have either built or are building an RV of their own. The experiences I've heard from word of mouth about Van's service have also won me over.
The debonair, macho, and strikingly handsome man of the family. Ok, scratch all of that, I'm just the pilot and guy that is good with the tools.
This beautiful young lady is the co-pilot, navigator, and the more thoughtful side to this equation we call marriage. Otherwise known as my better half
The oldest of three, willing to get me a drink whenever I need it.
The personality of the family, always willing to buck a rivet or two.
The energetic and always helpful co-builder that is always leaving my tools everywhere.
I had some time before my flight this morning so I decided to be productive and get those holes drilled. I put the skin back on and drilled all of the holes. Next is to Read more…
I am about to be out for a week and I wanted to get somethings prepped before I forgot them. I forgot to do some dimpling on the ribs so I did that and I Read more…
I got the aileron leading edges put together and drilled the counterbalance in its place. This included finalizing all of the deburring on the spar, straightening all of the flanges on the ribs that I Read more…